yamahapacifi
01-27-2009, 09:42 AM
When configuring a new feature, you are of course given the choice of entering a 'fixed' version or a date-based version. The date-based version can be configured at entitlement time, while the 'fixed' version cannot.
Can operations be configured so that the numeric version can be used and configured at entilement time? If not through the Flex-Ops user interface, is this possible using the Web Service interface?
Can operations be configured so that the numeric version can be used and configured at entilement time? If not through the Flex-Ops user interface, is this possible using the Web Service interface?